Showing posts with label Greyson. Show all posts
Showing posts with label Greyson. Show all posts

Sunday, September 10, 2017

SSKAL 2017

What a busy summer it's been!  I can't quite fathom how it's already September and the little boys are already back to school!  We finished off summer holidays with a bang and took an amazing ten day trip out West making it as far as Revelstoke, BC.  It was fantastic and we did so many amazing things on our trip!  One of the things that I did on the trip was knit.  Did you know that driving across Manitoba and Saskatchewan leaves a whole lot of time for knitting when you're not actually the driver?  A WHOLE LOT.

Thanks to the trip and hours upon hours of knitting time, I was able to finish my project for the Very Shannon Summer Sweater Knit Along.  The KAL ends today and I think this may be one of the few times I wasn't hoping for a deadline extension.  (Good thing too - Shannon mentioned recently that there wasn't going to be a vote for an extension this time!)

When the SSKAL was announced, since the rules allow for finishing up WIPs, I decided that I was going to take the opportunity of motivation of the KAL to finish up a project that had been languishing in my knitting bag for a few months and hopefully knit another project.  The project in question was Little Man's new Greyson sweater.  I had started it in March when I realized that there was no way he could squeeze himself into his original Greyson anymore.  Of course I shouldn't have been surprised.  He'd been wearing it since he was four years old.  No wonder it was too short and too tight!



I let him pick out yarn from Webs and he'd chose red and black James C. Brett Aztec - an acrylic, alpaca blend that I think will prove to be soft and very cozy.  He also chose how he wanted the stripe pattern to be. The sweater knit up fairly quickly given the very little I worked on it and within a month or so I was done.  Except the neckline was horrendous.  I should have taken a before shot to show how bad it was because it defies description.  I'm not sure what I did, but all my centered double decreases were not centered. Nor were they even in line with each other.  It was a hot mess.  So I was frustrated and left the sweater laying in my knitting bag until about a week into the SSKAL.  Then I ripped that offending neckline out, picked up the stitches and had it done and looking good by the end of the evening.  It was perfect timing, because the next morning Little Man woke up feverish and miserable.  Shivering and cold he curled up in his brand new sweater claiming it made him feel much better.

Greyson - Little Man

A few days later I had the chance to wind the wool for Baby Boy's sweater, because his second Greyson had also long since been outgrown.  He had also chose the black Aztec yarn and then had picked out some Estelle Chunky - an acrylic, wool, nylon blend - from the lys in the city and planned his stripe pattern.  I was determined to get his sweater done in time for wearing in the mountains, so knit like the wind, working on it every spare moment I had, which unfortunately with work and other mundane things like taking care of the house and yard wasn't a whole lot.  Thank goodness the sweater is small!  I started it on August 14th and by the time we headed out on the  highway August 26th I had just put the sleeve stitches back on the needle.

By the time I put my knitting down just outside of Moose Jaw, SK. because it was too dark in the truck to see anymore I had one sleeve done and 18 rounds plus a cuff left to do on sleeve two.  That was a LONG drive!   The next morning I picked it up again and had the second sleeve and ends woven in about a half hour or so west of Swift Current, SK.   Good thing too.  The next morning when the boys crawled out of the tent in Drumheller, AB it was quite chilly.  Baby Boy was thrilled to have his new sweater to put on and stay cozy until the sun warmed everything up.

Greyson - Drumheller


I had high hopes of getting the perfect finished object photo in the mountains, but trying to get photos of these two little goofballs when they're excited proves to be difficult, so I had to settle for this next one atop Whistler's Mountain in the Rockies.  You can sort of see the town of Jasper below through the smokey haze.  (No worries - there was quite a bit of land behind that rock they're standing on, it is just the angle that makes it look like they were perched on the very edge of the mountain!)

Greyson - Drumheller

Finishing Baby Boy's sweater so quickly gave me loads more road knitting time, but I'll tell you about that project next time!  I've got to catch up on some housework and then get the boys out to their power skate workshop this afternoon, plus I'm sure if you've read this long, you probably have other things you need to be doing too! LOL

Just one other quick "housekeeping" thing before I leave off.  I want to apologize for how some things are looking on the blog lately.  As you may be aware, Photobucket, which is what I used for a few years for photos on the blog, suddenly changed their policies without any warning in the spring.  In order to keep the photos showing up from them on the blog, they want a fee of $399/year.  Not going to happen!  So I need to clean things up and re-upload photos, but unfortunately I've had no time to do so yet, so please bare with me while things are in a bit of a messy state.

Sunday, March 19, 2017

A Little Bit of This and A Little Bit of That

I don't even remember when I was here last.  I'm not even going to look. It leads to all sorts of misplaced feeling of guilt and disappointment in myself.  Life has been soundly kicking my butt lately with everything going on, the sloth has become my spirit animal.  It's hard to accept given I normally like to be busy, getting things done, and more importantly used to relish in my night owl tendencies.  What was that meme going around Facebook awhile back?  "I'm not an early bird or a night owl. I'm some form of permanently exhausted pigeon."  That pretty much sums me up right now.

Despite all, I have been getting a few things done here and there.  I've actually even finished a few things!  I often listen to podcasts on my drive to work and one I really enjoy is The Knitmore Girls.  They have an ongoing instagram contest in the works called "Operation Sock Drawer" and Gigi often talks about the socks she's working on or has already knit.  Listening to all her talk of socks inspired me to pick up a long standing work in progress and get them done.  I actually started the Tin Can Knits SeaWall socks on March 11th last year.  (Bear in mind it normally it takes me a few weeks at most to knit a pair of socks.)  I finally cast off these babies on March 8th of this year.  What happened????  It's an interesting enough pattern.  The yarn wasn't horrible.  How did it take me just shy of a year to knit them?  It wasn't even a case of second sock syndrome holding me up.  Sock number one took until mid-February this year.  Ridiculous!  I'm super happy to have them off the needles and out of my knitting bag!

Seawall Socks by Tin Can Knits
I also finished my Andi Satterlund cardi, Henriette for the Selfish Sweater KAL in the Untangling Knots Ravelry group.  This one thankfully went quicker than the socks and I finished knitting it in exactly a month!  I'll show you some modelled pics of it at some point - I want to make a dress to actually go with it first, and quite frankly it's still sitting on top of my dresser waiting to get blocked.  But here's a sneaky peek at it, taken while I was doing the finishing!

Henriette by Andi Satterlund
And you know, since I have so little time for knitting, I've decided to cast on ALL the things in the last few weeks.  This is so weird for me.  I'm usually such a monogamous knitter that I have no hot clue how I'll ever manage to finish any of it. Really.  No clue.  How do you decide which project to work on when you have more than one on the go?  At first I justified it.  Sock knitting for portable knitting (hockey practices, car knitting, waiting rooms, lunch breaks etc.).

Lumberjack by Tin Can Knits

Shawl knitting for at home.

Polarity by Elena Nodel

Seemed reasonable.  Except I keep picking up the sock at home, and the shawl has been languishing. And then I decided that I should cast on a Greyson for Little Man on Thursday night.

Greyson by Julia Stanfield

WHAT IS WRONG WITH ME????  We won't even discuss that even though I have three projects already on the needles, it hasn't stopped me from downloading patterns and picking yarn out (from my stash at least) for other projects.  Someone needs to intervene and put a stop to this madness of multiple works in progress!

I've finished very few things at the sewing machine, but do have two of my 2017 Make Nine projects finished.  I just haven't taken photos of them yet, although I've been wearing them loads since sewing them.  Also.  I've been collecting WIP sewing projects in a similar fashion to what I've been doing in knitting.  I'm like a magpie -  Ooooh!  Must have all the shiny new things!!!!  Seriously. Someone send help!!!

So that's at least a bit of an update on my crafty doings as of late.   I'm going to try to get my sewing projects up here on the blog in the near future (no promises though - who knows when I'll actually get back to blogging again it seems to be so hit or miss for me lately).


Sunday, January 26, 2014

Greyson - 3.0

I love how much my kids like hand knits! It's such a pleasure to knit for such an appreciative crowd.

My most recent finished project was a long requested sweater for Little Man. He was quite envious of Baby Boy's Greyson that I knit in the summer and felt quite left out that he didn't have a mama knit pullover for himself. When I was in the thick of the holiday crafting I promised that in the new year when I could get to the yarn shop in the city I would get the yarn for his.

I really love Julia Stanfield's patterns. They really are my first choice when I start thinking about knits for the little ones. This is actually my seventh project from her Little Rascals E-book. Besides the two other Greyson (both for Baby Boy last year - the first one met with a tragic incident involving the wool chewing dog) I've also knit two Hotshots and two doll sized Hotshots. Her patterns are well written, practical but cute and quick as a wink to knit given their top down seamless construction.

I picked up the yarn on the 10th, got Little Man to wind it on the 11th and cast on the 12th. I cast off exactly one week later and Little Man was able to wear it to school last Monday morning. Instant gratification. You just can't beat it!

Winding his wool  - Very serious work!

Little Man has some pretty high (unrealistic) expectations for this mama's knitting abilities. At one point we had the following conversation when I pulled out my knitting to work a few rounds during a rare quiet moment in the afternoon:

Douglas:  is that my sweater, Mommy? Is it almost done? Can I try it on?   
Me: oh sweetie, it’s not ready yet. It’ll take me at least a couple of days… 
Douglas: (with tragic desperation in his voice) NOOOOOOOOOOOOOOOOOOOOOO! Don’t say a couple of days! I wanted you to be done it today! I need it!  
Me: but I just started it last night…
So the pressure was on. No lazing about on this one. Little Man is a harsh task master. Thank goodness it was a quick knit. I'm not sure how things would've gone if it wasn't. I suspect a fair amount of moaning and distress. The way he was going about you would think the poor lad had to walk about naked normally. I assure you that isn't the case - he has enough clothes for about half a dozen four year olds, he just didn't have a v-neck pullover exactly like his brother's.

He was so happy when I cast off and had to try it on the second I finished weaving in the final end
of yarn.  He wore it the rest of Sunday, Monday to school and a handful more times in the last week.  Good thing it's knit in my "go to for kid knits" Berroco Vintage, which is easy care machine wash.

Greyson 3.0 - in action
I've got a few other things on the needles right now that I can focus on now that Greyson is finished. I've been working on a pair of simple rib and cable socks from veteran sock designer Nancy Bush and have blocked and washed my gauge swatch for Braid Hills, a beautiful intricately cabled cardi by Scottish designer, Kate Davies. I am working up my nerve to dive into that one - I will admit looking ahead at the pattern has me a bit intimidated.  Beyond that I'm obsessing over a pair of colour work socks.  I can't decide between Water for the Elephants or Butterflies are Free (both by Rose Hiver), but a trip to the yarn shop is in my future next week when I'm in the city. Maybe I'll decide when I see what colour selection they have in stock. I just know that one of these designs will be knit, by me, starting next weekend.

How about you?  Anything you're dying to get started on?